Aircraft Logbook Entry 101: How To Properly Create & Utilize

January 14, 2026
Omar Maldonado

You rely on your records every time your aircraft leaves the ground. One missing aircraft logbook entry can be the difference between passing an audit and being grounded on the ramp.

If you want to keep your fleet flying safely, understanding how to create and maintain a compliant aircraft logbook entry isn't just a best practice; it's a requirement. Let's break down exactly what you need to know to get it right every time.

Main Takeaways:

  • Aircraft logbooks are official records of an aircraft's maintenance and inspection history. They help prove airworthiness and support safe operation.
  • FAA rules set specific requirements for maintenance and inspection entries. Required details can change based on the type of work performed.
  • Strong entries stay clear, complete, and easy to verify. They include the right approvals and signer credentials when required.
  • A simple process reduces mistakes. Teams should document work promptly and review entries before approval.
  • Digital recordkeeping can improve consistency and access. Tools like SOMA Software can help organize records and speed up inspections.

What Is an Aircraft Logbook?

An aircraft logbook is the official record of an aircraft's history. It documents maintenance, repairs, alterations, and inspections, such as annual and 100-hour checks. 

It also tracks Airworthiness Directive (AD) compliance and key time totals, like flight hours. FAA rules require maintenance and inspection record entries under 14 CFR 43.9 and 14 CFR 43.11. These records help prove airworthiness and support safe operation.

Many operators keep separate books or sections for major areas. Common categories include airframe, engines, propellers, and avionics or appliances. Pilots and crews also rely on flight logs for quick, day-to-day reference. Flight logs can help track recent flights, oil or fluid status, and what is due next.

Why Logbooks Matter for Aviation Teams and Operations

An airline employee working on a desktop computer while a person waits at the counter.

Logbooks do more than store history. Entries show what work was done, who performed it, and when it was completed. Teams use these details to plan maintenance, track repeated issues, and avoid missed intervals.

Accurate logbooks help aviation teams:

  • Prevent bigger problems: Good records help you spot issues early, like parts that fail often or tasks that get repeated.
  • Protect your aircraft's value: A full maintenance history can boost resale or lease value.
  • Speed up inspections: Clean, complete entries make FAA audits go smoother.
  • Reduce downtime: When you know what's been done and what's due, it's easier to plan ahead.
  • Increase accountability: Entries show who did the work and whether they were qualified.

Poor logbook entries can lead to extra inspection time, delayed flights, and compliance risk.

The FAA Rules That Make Accurate Logbooks Non-Negotiable

The FAA has strict rules about aircraft maintenance records. These rules help keep aircraft safe and ensure only airworthy planes are allowed to fly. If your logbooks don't meet these standards, you could face delays, fines, or worse.

Here are the key regulations you need to follow:

Regulation Who It Applies To Requirement
FAR 43.9 Maintenance personnel Write detailed entries for all repairs, changes, and preventive maintenance.
FAR 43.11 Inspectors Record the results of inspections and whether the aircraft is approved to fly again.
FAR 91.417 Aircraft owners/operators Keep and make available all maintenance records as required.
FAR 91.407 Operators Make sure logbook entries are completed before flying after any maintenance.

Following these rules is required. A digital record system like SOMA Software can help teams keep records organized and easier to review for completeness and consistency.

Examples

Explore Real-World Examples of Digital Logbooks

Want to see how other operators are using digital tools to stay compliant and reduce downtime? Explore aviation case studies featuring teams that simplified inspections and streamlined logbook management.

Explore SOMA Case Studies

What an Aircraft Logbook Entry Includes

A woman working on a desktop computer.

Logbook entry requirements depend on the type of work performed. Maintenance entries follow 14 CFR 43.9, while inspection entries follow 14 CFR 43.11. The list below covers common details for a complete entry, but required items can vary by entry type.

Date of the Entry

Use the date the work or inspection was finished. This date helps track intervals and due items. Teams should verify the date before approval.

Aircraft Identification (Tail Number)

Include the aircraft registration number when the entry applies to aircraft records. This keeps entries tied to the correct aircraft. Accurate tail numbers prevent audit confusion.

Description of Work Performed or Inspection

Write a short, clear summary of what happened and what action was taken. Use plain language and avoid vague phrases. Inspection entries should also state the type and extent of inspection.

Parts Information (When Applicable)

List part numbers and serial numbers when parts are installed, removed, replaced, or tracked. This supports traceability and future planning. Accurate part data prevents rework.

Approval for Return to Service (When Required)

Include an approval statement when the work requires return-to-service authorization. Inspection entries must state airworthiness status. Discrepancies should be listed when approval is not granted.

Name, Signature, and Certificate Details

Include the name and signature of the person approving the work. Include the certificate number and the certificate type. These details support verification during review.

References to ADs, SBs, or Inspection Program (When Applicable)

Reference an AD, SB, or inspection program when it applies. This ties the entry to the correct requirement. Clear references speed up inspections.

How to Create Accurate Aircraft Logbook Entries: Step-By-Step

Two people reviewing documents.

A strong logbook entry documents the work clearly and supports future review. Each step below helps reduce missed details and inspection delays.

Step 1: Write a Clear Summary of the Task

Start with a short, specific summary of what was done. The summary should explain the issue and the action taken. Avoid vague wording like "maintenance performed." Use specific language such as:

"Replaced alternator due to failure during preflight run-up. Installed P/N 12345, S/N 67890."

This helps future maintenance crews, auditors, or inspectors quickly understand what happened and why.

Step 2: Add Timing and Context

Use the date the work was finished. Add flight time or Hobbs readings when needed. Inspection entries also need the aircraft's total time in service. This information supports interval tracking and inspection timing.

If the action was part of a scheduled inspection or required service, mention that context:

"Completed 100-hour inspection per FAR 43.11."

Step 3: Link to Relevant Documents or Requirements

If the work relates to an AD, SB, or specific regulation, make that connection clear. Instead of listing codes without context, use plain language to explain:

"Complied with AD 2024-01-12 requiring torque check of aileron hinge bolts—no defects found."

This shows you're meeting FAA requirements and helps auditors verify compliance faster.

Step 4: Confirm Who Performed and Approved the Work

Include the name and certificate number of the person who performed the work. Include the approving person when a different person signs the entry. This confirms that qualified personnel completed and approved the task.

Electronic signatures can work when the record system keeps approvals secure and traceable. Always confirm your process matches FAA guidance and your operation's requirements.

Step 5: Review the Entry Before Finalizing

Don't rush to sign off. Double-check every part of the entry for:

  • Correct dates and tail numbers
  • Proper part numbers and descriptions
  • Clear references to applicable regulations
  • Missing names, credentials, or signatures

This review only takes a minute, but it can prevent major compliance issues later on.

Step 6: Store the Entry in a Secure, Searchable System

Save the entry in a secure, searchable system. Records should stay organized by aircraft and maintenance event. Teams should be able to retrieve entries quickly during inspections.

A digital system like SOMA Software can help you:

  • Centralize entries by aircraft and maintenance event.
  • Keep related documentation organized in one place.
  • Retrieve records faster during audits and inspections.

Keeping entries in one searchable place avoids scattered records and ensures you're always audit-ready.

Aircraft Maintenance

See How SOMA Simplifies Logbook Compliance

SOMA Software helps teams reduce errors and keep logbook records organized in one system. This ensures consistent documentation across maintenance workflows.

View Aircraft Maintenance Management Solution

Aircraft Logbook Entry Examples

Seeing real-world aircraft logbook entry examples helps clarify what proper documentation looks like.

Here are three common types of logbook entries that show you how to write clear, complete, and FAA-compliant records.

100-Hour Inspection Logbook Entry

This entry shows a standard 100-hour inspection. It includes a brief description, part replacement, and all required technician info.

Code Block Example
Maintenance Log Entry
Date: 10-May-2024
Aircraft: N123AB
Aircraft Total Time: 2,145.6 hours
Task: Completed 100-hour inspection. Scope followed the manufacturer's maintenance manual. Replaced left brake pad (P/N 45678, S/N 89012). Aircraft inspected and found airworthy. Approved for return to service.
Performed/Approved by: Jamie Lee, A&P Cert #321654
Signature: Jamie Lee

Why this works: The entry includes the inspection type, aircraft total time, and a clear return-to-service statement.

Component Replacement Logbook Entry

This entry shows how to properly log a part that was removed and replaced.

Code Block Example
Maintenance Log Entry
Date: 15-Jun-2024
Aircraft: N456CD
Task: Removed and replaced starter motor due to intermittent failure. Installed P/N 11223, S/N 44556. Functional test completed successfully.
Performed by: Alex Chen, A&P Cert #987321
Signature: Alex Chen

Why this works: The entry explains the issue, the action taken, and the installed part details for traceability.

AD Compliance Logbook Entry

This entry documents compliance with an FAA Airworthiness Directive.

Code Block Example
Maintenance Log Entry
Date: 22-Jul-2024
Aircraft: N789EF
Complied with AD 2024-05-12 requiring inspection of wing attach bolts. No discrepancies found. The timing for the next inspection will be determined based on the applicable maintenance schedule or regulatory requirements.
Performed by: Taylor Brooks, IA Cert #654789
Signature: Taylor Brooks
Reference: AD 2024-05-12

Why this works: The entry references the AD and documents the inspection outcome in plain language.

Common Logbook Pitfalls & How to Fix Them

A person holding a clipboard and marking results on a target sheet with a pen.

Small logbook errors can cause big delays. Most issues come from timing, consistency, and missing review steps. The fixes below help teams keep entries clean.

Incomplete or Late Logbook Entries

Waiting too long to fill out a logbook increases the chance of errors or missing details. Some teams forget to include key information like part numbers or technician names.

How to fix it: Always complete the logbook entry right after the work is done. Don't leave it for later or rely on memory.

Poor Record Organization and Storage

If your records are scattered across paper folders or different computers, it's easy to lose track. That makes it hard to find what you need during audits or inspections.

How to fix it: Use one system to store records. A platform like SOMA Software can help centralize entries so teams can find records faster during inspections and audits.

No Internal Review or Quality Control

If no one checks entries for mistakes, problems can build up over time. A single missed signature or wrong part number can lead to non-compliance.

How to fix it: Assign someone to review all entries regularly. Catching mistakes early saves time and keeps your records clean.

No Audit Trail or Version Tracking

Without a system to track changes, you can't prove when or how a log entry was edited. That makes audits harder and may raise red flags.

How to fix it: Use a digital logbook process that supports clear change tracking and review. A system like SOMA Software can help teams manage updates more consistently and keep records easier to verify over time.

READY

Ready to Ditch Paper Logbooks for Good?

Get a customized demo and see how SOMA Software can support a more consistent approach to logbook entries and record storage.

Get a Quote

Enhance Logbook Management with SOMA

Paper logbooks and scattered files can slow reviews and increase risk. Digital systems help teams keep entries consistent and easier to find.

SOMA Software supports logbook management with tools that help teams:

  • Store logbook records by aircraft and maintenance event.
  • Standardize entry workflows across the team.
  • Search and filter records during inspections and audits.
  • Control access with role-based permissions for viewing and approval.
  • Support internal reviews with reporting and record exports.

SOMA helps teams reduce errors and keep records easier to verify. Get a quote today!

menu